Case study: 1
Solar - Powered Irrigation Pump Sets
Project Overview
Sector: Agriculture / Rural Infrastructure
Geography: South India
Programme Type: Government-led renewable energy initiative
Systems Deployed: ~600 solar-powered irrigation pump sets
Typical System Size: 10–15 kW solar PV per installation
Pump Configuration: 7 HP DC submersible motor
Delivery Model: Multi-EPC implementation under a central programme framework
500 kW Rooftop Solar PV with Battery Energy Storage System (BESS)
Project Overview
Sector: Education / Institutional Infrastructure
Location: Mysore, Karnataka
Asset Type: University Engineering Campus
System Size: 500 kW rooftop solar PV
Energy Storage: Battery Energy Storage System (BESS)
Project Objective: Energy cost reduction and demand offset
Delivery Timeline: ~60 days from approval to commissioning
Case study: 2
Case study: 3
800 kW On-Grid Rooftop Solar PV for an Industrial Manufacturing Facility
Project Overview
Sector: Industrial Manufacturing
Client Type: Wooden pallet manufacturing facility
System Size: 800 kW rooftop solar PV
System Type: On-grid (net-metered) solar PV
Primary Objective: Energy cost reduction with capital efficiency
Project Scope: End-to-end design, compliance, and execution
1.5 MW Ground-Mounted Solar PV for a Private-Wire Industrial Park
Project Overview
Sector: Industrial Infrastructure
Asset Type: Industrial Park
Plant Capacity: 1.5 MW ground-mounted solar PV
Land Area: ~6 acres
Energy Model: Private-wire renewable energy supply
Contract Tenure: 25-year long-term power supply arrangement
Investment Model: Investor-backed (third-party capital)
Primary Objective: Long-term energy cost reduction for industrial tenants
Case study: 4
Case study: 5
Energy-Efficient Lighting Solutions for a 125-Acre Integrated Township
Project Overview
Sector: Integrated Real Estate Development
Project: Bhartiya City – Nikoo Homes
Location: Bengaluru, India
Development Scale: ~125 acres
Scope: Design, manufacture, supply, and installation of energy-efficient LED lighting
Project Duration: ~7+ years (from planning through completion)
Client Stakeholders: Chairman & Managing Director, Bhartiya City